Multi-Unit Prefabricated Workforce Apartment: 2-Story Combined Modular Dormitory with Walkway Balcony for Large-Scale Construction Sites
Product Details
Place of Origin: Jiangsu, China
Brand Name: Global Container(SuZhou)Co.,Ltd
Certification: ISO 9001 / ISO 14001 / ISO 45001 · CE Certification · SGS Inspection · Fireproof Certificate · Wind Resistance Test · Electrical CE / IEC / UL
Model Number: Detachable Container House
Payment & Shipping Terms
Minimum Order Quantity: 4
Price: 800-1050
Packaging Details: 18 units per 40HQ container.
Delivery Time: 10-20 work day
Payment Terms: L/C,T/T
Supply Ability: Up to 300 units per day
prefabricated detachable tiny house
,prefabricated detachable container house
,modular detachable tiny house
Dimensions: |
Standard 20ft Or 40ft Container Size |
Shipment: |
Ship Disassembled |
Wallthickness: |
50mm To 100mm |
Floor Loading Capacity: |
150 ㎏/㎡ |
Frame: |
Q235B Galvanized Steel |
Wallboard: |
Glass Wool Sandwich Panels |
Application: |
Warehouse |
Durability: |
Weather-resistant And Corrosion-proof Coating |
Wind Resistance: |
100km/h |
Main Materia: |
Light Steel Frame & Sandwich Panel |
Services: |
2D Floor Plan Solution; 3D Model |
Productname: |
Prefabricated Container House |
Cutting: |
Saw Cutting |
Assemblytime: |
1-3 Days Per Unit |
Wind Resistence: |
120KM/H |
Dimensions: |
Standard 20ft Or 40ft Container Size |
Shipment: |
Ship Disassembled |
Wallthickness: |
50mm To 100mm |
Floor Loading Capacity: |
150 ㎏/㎡ |
Frame: |
Q235B Galvanized Steel |
Wallboard: |
Glass Wool Sandwich Panels |
Application: |
Warehouse |
Durability: |
Weather-resistant And Corrosion-proof Coating |
Wind Resistance: |
100km/h |
Main Materia: |
Light Steel Frame & Sandwich Panel |
Services: |
2D Floor Plan Solution; 3D Model |
Productname: |
Prefabricated Container House |
Cutting: |
Saw Cutting |
Assemblytime: |
1-3 Days Per Unit |
Wind Resistence: |
120KM/H |
| Standard Size | 5950mm (L) x 3000mm (W) x 2800mm (H) |
|---|---|
| Main Frame | 2.3mm to 3.0mm Spray Painted Galvanization Steel Tube |
| Wall Partition | 50mm/75mm/100mm Rock Wool/EPS/PU Sandwich Panel with 0.3-0.5mm color steel plate |
| Roof System | 0.42mm Color Steel Plate + Insulation cotton + multi-waterproof sealing |
| Ceiling | 0.24mm Color Steel Plate |
| Floor System | 15mm/18mm MGO Board or Cement Fiber Board + PVC floor leather |
| Doors & Windows | 0.4mm Steel door; Plastic Steel Sliding Windows * 2 sets |
| Resistance | Seismic Resistance Grade 8; Wind Resistance Grade 10-11 |
| Service Life | 8 - 10 Years |
- Large-Scale Construction Site Dormitories: Interconnected, double-decker staff housing blocks providing safe, structured lodging for hundreds of engineering personnel.
- Remote Mining & Resource Energy Camps: Heavy-duty, sand-and-dust-resistant living suites for oil, gas, and mineral extraction teams in isolated outposts.
- Industrial Park Subsidized Apartments: Scalable, neat, and highly aesthetic temporary housing quarters for manufacturing plants and export processing zones.
- Tactical Field Operational Villages: High-load emergency response accommodation complexes, civil defense transition quarters, and temporary community lodging blocks.
- Massive Camp Footprint Maximization: The specialized double-decker structural framing doubles your on-site bed capacity vertically. Incorporating a continuous walkway balcony and steel stairs provides neat, independent room access while freeing up valuable field terrain.
- Fire-Retardant MGO Flooring Matrix: Outfitted with structural 15mm/18mm MGO board subfloors, delivering an excellent fire barrier, sound deadening between levels, and a completely flat surface that ensures safe vertical stacking.
- Premium Insulation & Guard Security: Combines natural-looking wood aesthetic panels with heavy-duty security barred windows, providing a warm, dignified residential look while offering structural defense against forced entry or flying worksite debris.
- Unparalleled Flat-Pack Ocean Logistics: Optimized for large-scale enterprise purchasing; our precise knock-down packing format allows a single 40HQ container to transport up to 18 complete sets, slashing bulk landing freight overheads.
- Rapid Interlocking Field Mobilization: Meet strict project deployment deadlines without expensive specialized trade labor. A standard field crew of 4 workers can bolt together a single structural cabin enclosure in under 3 hours using basic hand tools.
- Site Inspection: Prepare a flat layout on the camp area or align pre-cast concrete block foundations at the corner load points to safeguard the compound structure.
- Chassis Fastening: Securely connect the primary galvanized floor perimeter framing to the corner castings using high-tensile structural bolts.
- Frame Column & Walkway Elevation: Erect the four white vertical columns, bolt the pre-sealed roof framework tightly overhead, and integrate the external stairs and continuous walkway railings.
- Enclosure Insertion: Slide the high-insulation wood-grain sandwich panels and the barred window systems smoothly into the precision-machined frame channels.
- Turnkey Finish Readying: Lay the fire-retardant MGO flooring sheets, roll out the durable PVC finish, stack subsequent multi-unit tiers using heavy-duty links, and activate the pre-wired electrical networks.