Rust-Proof Prefabricated Living Pod for Indonesia Mining Zone: Sealed Multi-Waterproof White-Frame Accommodation Unit
Product Details
Place of Origin: Jiangsu, China
Brand Name: Global Container(SuZhou)Co.,Ltd
Certification: ISO 9001 / ISO 14001 / ISO 45001 · CE Certification · SGS Inspection · Fireproof Certificate · Wind Resistance Test · Electrical CE / IEC / UL
Model Number: Detachable Container House
Payment & Shipping Terms
Minimum Order Quantity: 4
Price: 800-1050
Packaging Details: 18 units per 40HQ container.
Delivery Time: 10-20 work day
Payment Terms: L/C,T/T
Supply Ability: Up to 300 units per day
prefabricated detachable tiny house
,prefabricated detachable container house
,waterproof detachable tiny house
Dimensions: |
Standard 20ft Or 40ft Container Size |
Shipment: |
Ship Disassembled |
Wallthickness: |
50mm To 100mm |
Floor Loading Capacity: |
150 ㎏/㎡ |
Frame: |
Q235B Galvanized Steel |
Wallboard: |
Glass Wool Sandwich Panels |
Application: |
Warehouse |
Durability: |
Weather-resistant And Corrosion-proof Coating |
Wind Resistance: |
100km/h |
Main Materia: |
Light Steel Frame & Sandwich Panel |
Services: |
2D Floor Plan Solution; 3D Model |
Productname: |
Prefabricated Container House |
Cutting: |
Saw Cutting |
Assemblytime: |
1-3 Days Per Unit |
Wind Resistence: |
120KM/H |
Dimensions: |
Standard 20ft Or 40ft Container Size |
Shipment: |
Ship Disassembled |
Wallthickness: |
50mm To 100mm |
Floor Loading Capacity: |
150 ㎏/㎡ |
Frame: |
Q235B Galvanized Steel |
Wallboard: |
Glass Wool Sandwich Panels |
Application: |
Warehouse |
Durability: |
Weather-resistant And Corrosion-proof Coating |
Wind Resistance: |
100km/h |
Main Materia: |
Light Steel Frame & Sandwich Panel |
Services: |
2D Floor Plan Solution; 3D Model |
Productname: |
Prefabricated Container House |
Cutting: |
Saw Cutting |
Assemblytime: |
1-3 Days Per Unit |
Wind Resistence: |
120KM/H |
| Parameter | Specification Details |
|---|---|
| Standard Size | 5950mm (L) x 3000mm (W) x 2800mm (H) |
| Main Frame | 2.3mm to 3.0mm Spray Painted Galvanization Steel Tube |
| Wall Partition | 50mm/75mm/100mm Rock Wool/EPS/PU Sandwich Panel with 0.3-0.5mm color steel plate |
| Roof System | 0.42mm Color Steel Plate + Insulation cotton + multi-waterproof sealing |
| Ceiling | 0.24mm Color Steel Plate |
| Floor System | 15mm/18mm MGO Board or Cement Fiber Board + PVC floor leather |
| Doors & Windows | 0.4mm Steel door; Plastic Steel Sliding Windows * 2 sets |
| Resistance | Seismic Resistance Grade 8; Wind Resistance Grade 10-11 |
| Service Life | 8 - 10 Years |
- Remote Mining Accommodation Pods: Heavy-duty, corrosion-resistant workforce housing and administrative blocks for nickel, coal, or gold mining crews in high-humidity rainforest climates.
- Early Groundwork Site Offices: Quick-setup field operations cabins and secure geological survey rooms erected directly over unpaved foundation layouts.
- Tactical Field Support Units: Weather-tight temporary supply quarters, localized field clinics, and civil defense transition facilities built for flood-prone zones.
- Industrial Park Administrative Hubs: Clean, uniform, and professional site workspaces for corporate site managers and general engineering contractors.
- Rust-Proof Anti-Corrosive Shield: The entire heavy framework undergoes advanced zinc galvanization followed by a deep spray-painted finish, fully isolating the steel from corrosive tropical moisture and salty coastal air over its 8-10 year service life.
- Sealed Multi-Waterproof Roof Matrix: The engineered roofing network pairs thick color steel plates with a specialized internal U-shaped drainage matrix and multi-layer structural weather-sealants, ensuring a 100% dry interior during heavy equatorial monsoons.
- Integrated Window Grille Security: Outfitted with robust, white-coated window guard grilles to prevent unauthorized access, theft of mining tools, or impact damage from high-wind debris on active excavation sites.
- Unparalleled Flat-Pack Freight Savings: Optimized for high-volume logistics; our precise knock-down breakdown format allows a single 40HQ ocean container to securely transport up to 18 complete sets, driving down bulk landing costs.
- Rapid Ground-Level Field Setup: Eliminate prolonged commercial building timelines and expensive local contractor labor. A standard site crew of 4 workers can bolt together one structural module enclosure in under 3 hours using basic hand tools.
- Site Inspection: Prepare a flat ground space over the construction layout or place elementary pre-cast concrete blocks at the main corner load-bearing points.
- Chassis Fastening: Securely connect the primary galvanized floor perimeter framing to the corner castings using high-tensile structural bolts.
- Frame Column Elevation: Erect the four white-coated vertical columns and bolt the multi-waterproof roof framework tightly onto the top cast blocks.
- Enclosure Insertion: Slide the high-insulation sandwich panels and the barred window systems smoothly into the precision-machined frame tracks.
- Turnkey Finishing: Secure the fire-resistant interior MGO flooring sheets, roll out the durable PVC leather finish, and active the pre-routed "plug-and-play" electrical network.